Logg inn

Logg inn med ditt passord for å redigere hjemmesiden!

Skriv inn epostadressen din (må være den som er registrert på Mekke), og trykk på "Send meg passord" for å bli tilsendt nytt passord på epost.

Hopp til innhold

noen

Pressure Boosting Station

The entire pressure boosting station can be delivered fully assembled with all components. The piping system is pressure-tested and all functions have been verified. Only connection of inlet and outlet pipelines, as well as electrical connections, is required on site. This contributes to fast and cost-effective installation work at the job site, requiring minimal manpower.

Pumps and fittings can be supplied in the manufacturer of your choice. Soft-sealing non-return and shut-off valves are used. Pressure pipes and suction pipes are typically made of stainless steel. The piping system is designed and installed to ensure minimal pressure loss.

A bypass connection for piping at the pumps and a water meter can also be installed.

Flexible control equipment can be fitted according to the system’s functional requirements.

The station can also be delivered with acid-resistant sleepers (base supports) and heating cables embedded in the floor structure.

bilde

Share on Facebook

Logg inn